6th June 2021

06/06/2021

Sunday 6th June 2021:

Due to planned early morning Network Rail engineering works in the Birmingham area, the following trains are amended as shown:

  • 08.28 Birmingham Moor Street - Marylebone starts at Dorridge at 08.40. A connecting rail replacement bus will operate from Birmingham Moor Street (07.35) and Solihull (08.10) to Dorridge.
  • 08.47 Birmingham Moor Street - Marylebone starts at Dorridge at 08.58. A connecting rail replacement bus will operate from Birmingham Moor Street (07.55) and Solihull (08.30) to Dorridge.
  • The first through Birmingham - Marylebone train will be the 09.12 Birmingham Moor Street - Marylebone.

Additionally, due to a late notice London Underground evening route closure, no Chiltern Railways trains will operate between Marylebone and Aylesbury Vale Parkway between approximately 18:00 and 21:15. During this period, rail replacement buses will operate, connecting with trains to/from Marylebone at Gerrards Cross.

Please refer to the PDF timetable/s below - these will be uploaded to this page as soon as they are finalised.

Please check your train times carefully.

Last updated: 04/06/21 - 09:16