4th September 2021

04/09/2021

Saturday 4th September 2021:

Due to planned late night Network Rail engineering works in the Bicester Village area, the following services are amended as shown:

  • The 22.12 Marylebone-Oxford will terminate at Bicester North; a connecting rail replacement bus will operate to Bicester Village, Oxford Parkway and Oxford.
  • The 23.10 Marylebone-Oxford will terminate at Bicester North; a connecting rail replacement bus will operate to Bicester Village, Oxford Parkway and Oxford.
  • The 23.26 Oxford - Bicester Village is replaced by a bus throughout.

Additionally, due to the reduced West Midlands Trains timetable in operation, the following Chiltern Railways services are amended to call additionally at some WMT stations/retimed as shown below. Additional stops are shown in bold:

  • 09.00 Marylebone-Birmingham Moor Street is amended from Leamington Spa: Warwick (10.36) - Warwick Parkway (10.40) - Dorridge (10.50) - Widney Manor (10.53) - Solihull (10.57) - Olton (11.00) - Acocks Green (11.03) and as published to Birmingham Moor Street.
  • 13.00 Marylebone-Birmingham Moor Street is amended from Leamington Spa: Warwick (14.36) - Warwick Parkway (14.40) - Dorridge (14.50) - Widney Manor (14.53) - Solihull (14.57) - Olton (15.00) - Acocks Green (15.03) and as published to Birmingham Moor Street.
  • 15.00 Marylebone-Birmingham Moor Street is amended from Leamington Spa: Warwick (16.36) - Warwick Parkway (16.40) - Dorridge (16.50) - Widney Manor (16.53) - Solihull (16.57) - Olton (17.00) - Acocks Green (17.03) and as published to Birmingham Moor Street.

Please refer to the PDF timetable/s below - these will be uploaded to this page as soon as they are finalised.

Please check your train times carefully.

Last updated: 29/07/21 - 02:30