29th June 2026
Monday 29th June 2026:
An amended timetable will be in operation, in respect of the following:
- Wembley Stadium event - Harry Styles.
- Planned engineering works (late night).
- (Routine maintenance in the Oxford area).
An enhanced timetable will be in operation during the afternoon and evening, with additional Wembley Stadium stops in trains, and also some additional trains.
Consequentially, there will be some changes to evening peak services from Marylebone, as follows:
- 16.45 Marylebone - Oxford is formed of 5 carriages instead of 6.
- 17.07 Marylebone - Birmingham Moor Street is formed of 4 carriages instead of 5.
- 17.15 Marylebone - Oxford is formed of 4 carriages instead of 5.
- 17.30 Marylebone - Aylesbury Vale Parkway calls additionally at Amersham.
- 17.41 Marylebone - Aylesbury (via Amersham) is CANCELLED.
- 17.53 Marylebone - West Ruislip is CANCELLED.
- 18.11 Marylebone - Aylesbury (via Amersham) is CANCELLED.
- 18.30 Marylebone - Aylesbury Vale Parkway departs at 18.31 and is formed of 2 carriages instead of 3.
There will also be some changes to evening peak services from Birmingham, as follows:
- 17.11 Birmingham Snow Hill - Marylebone calls additionally at Lapworth and Hatton.
- 17.21 Birmingham Moor Street - Leamington Spa is CANCELLED.
In respect of planned engineering works, the railway is closed in the Oxford area after 23.15, affecting the following late night services:
- 00.01 Marylebone - Oxford is diverted to Bicester North.
- 00.22 Oxford - Banbury is CANCELLED.
Passengers travelling to Bicester Village, Oxford Parkway and Oxford on the above 00.01 service should change at Bicester North for a connecting rail replacement bus service.
Rail replacement buses will operate as follows during this period:
- Bicester North - Bicester Village - Oxford Parkway - Oxford.
- Oxford - Banbury (direct).
Finalised timetables are uploaded into online journey planners 9 weeks before the date of operation. Please check your journey in the planner at the following link: https://buy.chilternrailways.co.uk/. Any journey checked outside of this timescale may be subject to change; please double-check how these amendments are due to affect your travel plans. For some engineering works and special events at Wembley Stadium, timetables may be released closer to the date of operation.