19th July 2025

19/07/2025

Saturday 19th July 2025:

An amended timetable will be in operation, in respect of the following:

  • Wembley Stadium event - Dubois vs Usyk (Boxing).
  • Timetable changes to 20.32 and 21.02 Marylebone - Birmingham services.

An enhanced timetable will be in operation during the afternoon and evening, with additional Wembley Stadium stops in trains, and also some additional trains.

A reduced service of 1 train per hour will operate between Marylebone and Aylesbury Vale Parkway during the afternoon and evening, until 20.00. After 20.00, no Chiltern Railways trains will operate on the Marylebone/Aylesbury Vale Parkway route. During this period, rail replacement buses will operate as follows, connecting with London Underground Metropolitan Line services to/from Baker Street at Amersham:

  • Amersham - Great Missenden - Wendover - Stoke Mandeville - Aylesbury - Aylesbury Vale Parkway.

Additionally, due to planned engineering works at Dorridge the next day, the following services are amended as shown:

  • 20.32 Marylebone - Birmingham Moor Street terminates at Warwick Parkway (connecting rail replacement bus to Dorridge, Solihull and Birmingham Moor Street).
  • 21.02 Marylebone - Birmingham Moor Street terminates at Warwick Parkway (connecting rail replacement bus to Dorridge, Solihull and Birmingham Moor Street).

Finalised timetables are uploaded into online journey planners 9 weeks before the date of operation. Please check your journey in the planner at the following link: https://buy.chilternrailways.co.uk/. Any journey checked outside of this timescale may be subject to change; please double-check how these amendments are due to affect your travel plans. For some engineering works and special events at Wembley Stadium, timetables may be released closer to the date of operation.

Last updated: 05/06/25 - 10:54