12th September 2025
Friday 12th September 2025:
An amended timetable will be in operation, in respect of the following:
- RMT industrial action (London Underground).
- Wembley Stadium event - Coldplay.
- (Re-scheduled from Monday 8th September).
Industrial action by London Underground RMT members will affect our ability to operate certain aspects of our service. The following timetable alterations apply:
- Until approximately 08.00: No Chiltern Railways trains will operate on the route Marylebone - Aylesbury Vale Parkway (via Amersham).
In respect of the Wembley Stadium event, an enhanced timetable will be in operation during the afternoon and evening, with additional Wembley Stadium stops in trains, and also some additional trains.
Consequentially, there will be some changes to evening peak services from Marylebone, as follows:
- 17.37 Marylebone - Birmingham Snow Hill terminates at Birmingham Moor Street.
- 17.53 Marylebone - West Ruislip is CANCELLED.
- 18.30 Marylebone - Aylesbury Vale Parkway departs at 18.31.
- 18.37 Marylebone - Birmingham Snow Hill terminates at Birmingham Moor Street.
Additionally, there will also be some changes to evening peak services from Birmingham, as follows:
- 17.11 Birmingham Snow Hill - Marylebone calls additionally at Lapworth and Hatton.
- 17.20 Birmingham Moor Street - Leamington Spa is CANCELLED.
Finalised timetables are uploaded into online journey planners 9 weeks before the date of operation. Please check your journey in the planner at the following link: https://buy.chilternrailways.co.uk/. Any journey checked outside of this timescale may be subject to change; please double-check how these amendments are due to affect your travel plans. For some engineering works and special events at Wembley Stadium, timetables may be released closer to the date of operation.