Changes To Train Times | Chiltern Railways

Changes To Train Times

April 2017

Sun Mon Tue Wed Thu Fri Sat
26
27
28
29
30
31
1
 
 
 
 
 
 
 
2
3
4
5
6
7
8
 
 
 
 
 
 
 
9
10
11
12
13
14
15
 
 
 
 
 
 
 
16
17
18
19
20
21
22
 
 
 
 
 
 
 
23
24
25
26
27
28
29
 
 
 
 
 
Major change
Major change

London – High Wycombe – Oxford / Birmingham


Timetable Changes – Wembley Stadium Event


There is a major sporting event at Wembley Stadium – Checkatrade Trophy Final (Coventry City vs Oxford United). An amended timetable will operate for the whole day, with specially-lengthened and additional trains running from both Oxford Parkway and Warwick Parkway direct to Wembley Stadium.


From Oxford Parkway to Wembley Stadium: High-capacity trains will depart at: 07.49, 08.16, 08.46, 09.08, 09.39, 09.56, 10.14, 10.25, 10.40, 11.08, 11.13, 11.43, 12.14, 12.44 and 13.15.


From Warwick Parkway to Wembley Stadium: High-capacity trains will depart at: 08.49, 09.02, 09.17, 09.39, 10.05, 10.17, 10.43, 10.54, 11.18, 11.41, 12.16 and 12.39.


If you are travelling from Oxford, please use Oxford Parkway station; if you are travelling from Bicester, please use Bicester North station; if you are travelling from the Coventry area, please use Warwick Parkway station. All these stations have large car parks.


IMPORTANT: If you are travelling by train for this event, please ensure you collect/print off your travel ticket(s) before the day of travel.


London – Amersham – Aylesbury Vale Parkway


Timetable Changes – Reduced Service


A reduced frequency of one train per hour will operate between Marylebone and Aylesbury after approximately 15:00. Additionally, during this period, buses will replace trains between Aylesbury and Aylesbury Vale Parkway.


Previously-planned engineering works in the Aylesbury area for this day has been CANCELLED.


Please refer to the attached timetables for full details.


 
Minor change
Minor change

London – High Wycombe – Oxford / Birmingham


Timetable Changes – Wembley Stadium Event


There is a sporting event at Wembley Stadium – Saracens vs Harlequins. An amended timetable will operate for most of the day, with many services calling additionally at Wembley Stadium.


London – Amersham – Aylesbury Vale Parkway


Timetable Changes – Reduced Service


A reduced frequency of one train per hour will operate between Marylebone and Aylesbury after approximately 15:00. Additionally, during this period, buses will replace trains between Aylesbury and Aylesbury Vale Parkway.


Please refer to the attached timetables for full details.


 
Minor change
Minor change

London – High Wycombe – Oxford / Birmingham


Minor Timetable Change


The 17.21 Marylebone – Bicester North service is extended to Banbury (arr 18.40).


Otherwise, a normal Monday-Friday timetable will operate, with no planned alterations.


London – Amersham – Aylesbury Vale Parkway


No Timetable Changes


A normal Monday-Friday timetable will operate, with no planned alterations.


 
Minor change
Minor change

London – High Wycombe – Oxford / Birmingham


Timetable Changes – Good Friday (Public Holiday)


An amended Saturday timetable will operate; no services will call at Sudbury Harrow Road or Sudbury Hill Harrow.


London – Amersham – Aylesbury Vale Parkway


Timetable Changes – Engineering Works


Until Approximately 12:00: Due to London Underground engineering works, a reduced service of one train per hour will operate between Aylesbury Vale Parkway and stations to Amersham. Connecting buses will operate between Amersham and Beaconsfield, for connecting trains to/from Marylebone.


From Approximately 12:00: An amended Saturday timetable will operate between Marylebone and stations to Aylesbury Vale Parkway.


Please refer to the attached timetables for full details.


 
Minor change
Minor change

London – High Wycombe – Oxford / Birmingham


No Timetable Changes


A normal Saturday timetable will operate, with no planned alterations.


London – Amersham – Aylesbury Vale Parkway


Timetable Changes – Engineering Works


Until Approximately 12:00: Due to London Underground engineering works, a reduced service of one train per hour will operate between Aylesbury Vale Parkway and stations to Amersham. Connecting buses will operate between Amersham and Beaconsfield, for connecting trains to/from Marylebone.


From Approximately 12:00: A normal Saturday timetable will operate between Marylebone and stations to Aylesbury Vale Parkway.


Please refer to the attached timetable for full details.


 
Minor change
Minor change

London – High Wycombe – Oxford / Birmingham


No Timetable Changes


A normal Sunday timetable will operate, with no planned alterations.


London – Amersham – Aylesbury Vale Parkway


Timetable Changes – Engineering Works


Until Approximately 12:00: Due to London Underground engineering works, a reduced service of one train per hour will operate between Aylesbury Vale Parkway and stations to Amersham. Connecting buses will operate between Amersham and Beaconsfield, for connecting trains to/from Marylebone.


From Approximately 12:00: A normal Sunday timetable will operate between Marylebone and stations to Aylesbury Vale Parkway.


Please refer to the attached timetable for full details.


 
Minor change
Minor change

London – High Wycombe – Oxford / Birmingham


Timetable Changes – Easter Monday (Public Holiday)


An amended Saturday timetable will operate; no services will call at Sudbury Harrow Road or Sudbury Hill Harrow.


London – Amersham – Aylesbury Vale Parkway


Timetable Changes – Engineering Works


All Day: Due to London Underground engineering works, a reduced service of one train per hour will operate between Aylesbury Vale Parkway and stations to Amersham. Connecting buses will operate between Amersham and Beaconsfield, for connecting trains to/from Marylebone.


Please refer to the attached timetables for full details.


 
Minor change
Minor change

London – High Wycombe – Oxford / Birmingham


Timetable Changes – Wembley Stadium Event


There is a sporting event at Wembley Stadium – FA Cup Semi-Final (Chelsea vs Tottenham Hotspur). An amended timetable will operate for most of the day, with many services calling additionally at Wembley Stadium.


London – Amersham – Aylesbury Vale Parkway


Timetable Changes – Reduced Service


A reduced frequency of one train per hour will operate between Marylebone and Aylesbury after approximately 15:00. Additionally, during this period, buses will replace trains between Aylesbury and Aylesbury Vale Parkway.


Please refer to the attached timetables for full details.


 
Minor change
Minor change

London – High Wycombe – Oxford / Birmingham


Timetable Changes – Engineering Works & Special Events


Until Approximately 10:00: Due to Network Rail engineering works in the Leamington Spa area, buses will replace trains between Banbury – Leamington Spa – Warwick – Warwick Parkway.


In connection with the London Marathon, the following additional early morning trains will operate:


* Banbury 06.40 - Bicester North 06.54 - Haddenham & Thame Parkway 07.06 - High Wycombe 07.20 - Beaconsfield 07.27 - Gerrards Cross 07.33 - Marylebone 07.56.


* Aylesbury 07.00 - Princes Risborough 07.16 - High Wycombe 07.27 - Beaconsfield 07.34 - Gerrards Cross 07.40 - Denham 07.44 - South Ruislip 07.50 - Marylebone 08.09.


Additionally, there is a sporting event at Wembley Stadium – FA Cup Semi-Final (Arsenal vs Manchester City). An amended timetable will operate for most of the day, with many services calling additionally at Wembley Stadium.


London – Amersham – Aylesbury Vale Parkway


Timetable Changes – Reduced Service


A reduced frequency of one train per hour will operate between Marylebone and Aylesbury after approximately 15:00. Additionally, during this period, buses will replace trains between Aylesbury and Aylesbury Vale Parkway.


Please refer to the attached timetables for full details.


 
Minor change
Minor change

London – High Wycombe – Oxford / Birmingham


Timetable Changes – Engineering Works


Late Night: Due to overnight engineering works, the line is closed between Princes Risborough and Aylesbury after 23.55. The following services will be amended as shown:


The 23.00, 23.30 and 00.10 Marylebone – Aylesbury will terminate at High Wycombe. Connecting rail replacement buses will operate between High Wycombe and stations to Aylesbury.


The 23.15 Oxford – High Wycombe will terminate at Princes Risborough. A connecting rail replacement bus will operate between Princes Risborough and High Wycombe.


London – Amersham – Aylesbury Vale Parkway


Timetable Changes – Engineering Works


Late Night: Due to overnight engineering works, the line is closed between Aylesbury and Aylesbury Vale Parkway after 21.35. The following services will be amended as shown:


The 20.57, 21.57, 22.57 and 23.57 Marylebone – Aylesbury Vale Parkway will terminate at Aylesbury. Connecting rail replacement buses will operate between Aylesbury and Aylesbury Vale Parkway.


Please refer to the attached timetables for full details.


 
Minor change
Minor change

London – High Wycombe – Oxford / Birmingham


Timetable Changes – Engineering Works


Early Morning: Due to overnight engineering works, the 05.02 Aylesbury – Marylebone service will start from High Wycombe at 05.31. A connecting rail replacement bus will operate from Aylesbury as follows:


Bus: Aylesbury 04.30 – Little Kimble 04.45 – Monks Risborough 04.50 – Princes Risborough 04.55 – Saunderton 05.00 – High Wycombe 05.20.


Late Night: Due to overnight engineering works, the line is closed between Princes Risborough and Aylesbury after 23.55. The following services will be amended as shown:


The 23.00, 23.30 and 00.10 Marylebone – Aylesbury will terminate at High Wycombe. Connecting rail replacement buses will operate between High Wycombe and stations to Aylesbury.


The 23.15 Oxford – High Wycombe will terminate at Princes Risborough. A connecting rail replacement bus will operate between Princes Risborough and High Wycombe.


London – Amersham – Aylesbury Vale Parkway


Timetable Changes – Engineering Works


Late Night: Due to overnight engineering works, the line is closed between Aylesbury and Aylesbury Vale Parkway after 21.35. The following services will be amended as shown:


The 20.57, 21.57, 22.57 and 23.57 Marylebone – Aylesbury Vale Parkway will terminate at Aylesbury. Connecting rail replacement buses will operate between Aylesbury and Aylesbury Vale Parkway.


Please refer to the attached timetables for full details.


 
Minor change
Minor change

London – High Wycombe – Oxford / Birmingham


Timetable Changes – Engineering Works


Early Morning: Due to overnight engineering works, the 05.02 Aylesbury – Marylebone service will start from High Wycombe at 05.31. A connecting rail replacement bus will operate from Aylesbury as follows:


Bus: Aylesbury 04.30 – Little Kimble 04.45 – Monks Risborough 04.50 – Princes Risborough 04.55 – Saunderton 05.00 – High Wycombe 05.20.


Late Night: Due to overnight engineering works, the line is closed between Princes Risborough and Aylesbury after 23.55. The following services will be amended as shown:


The 23.00, 23.30 and 00.10 Marylebone – Aylesbury will terminate at High Wycombe. Connecting rail replacement buses will operate between High Wycombe and stations to Aylesbury.


The 23.15 Oxford – High Wycombe will terminate at Princes Risborough. A connecting rail replacement bus will operate between Princes Risborough and High Wycombe.


London – Amersham – Aylesbury Vale Parkway


Timetable Changes – Engineering Works


Late Night: Due to overnight engineering works, the line is closed between Aylesbury and Aylesbury Vale Parkway after 21.35. The following services will be amended as shown:


The 20.57, 21.57, 22.57 and 23.57 Marylebone – Aylesbury Vale Parkway will terminate at Aylesbury. Connecting rail replacement buses will operate between Aylesbury and Aylesbury Vale Parkway.


Please refer to the attached timetables for full details.


 
Minor change
Minor change

London – High Wycombe – Oxford / Birmingham


Timetable Changes – Engineering Works


Early Morning: Due to overnight engineering works, the 05.02 Aylesbury – Marylebone service will start from High Wycombe at 05.31. A connecting rail replacement bus will operate from Aylesbury as follows:


Bus: Aylesbury 04.30 – Little Kimble 04.45 – Monks Risborough 04.50 – Princes Risborough 04.55 – Saunderton 05.00 – High Wycombe 05.20.


Late Night: Due to overnight engineering works, the line is closed between Princes Risborough and Aylesbury after 23.55. The following services will be amended as shown:


The 23.00, 23.30 and 00.10 Marylebone – Aylesbury will terminate at High Wycombe. Connecting rail replacement buses will operate between High Wycombe and stations to Aylesbury.


The 23.15 Oxford – High Wycombe will terminate at Princes Risborough. A connecting rail replacement bus will operate between Princes Risborough and High Wycombe.


London – Amersham – Aylesbury Vale Parkway


Timetable Changes – Engineering Works


Late Night: Due to overnight engineering works, the line is closed between Aylesbury and Aylesbury Vale Parkway after 21.35. The following services will be amended as shown:


The 20.57, 21.57, 22.57 and 23.57 Marylebone – Aylesbury Vale Parkway will terminate at Aylesbury. Connecting rail replacement buses will operate between Aylesbury and Aylesbury Vale Parkway.


Please refer to the attached timetables for full details.


 
Minor change
Minor change

London – High Wycombe – Oxford / Birmingham


Timetable Changes – Engineering Works


Early Morning: Due to overnight engineering works, the 05.02 Aylesbury – Marylebone service will start from High Wycombe at 05.31. A connecting rail replacement bus will operate from Aylesbury as follows:


Bus: Aylesbury 04.30 – Little Kimble 04.45 – Monks Risborough 04.50 – Princes Risborough 04.55 – Saunderton 05.00 – High Wycombe 05.20.


London – Amersham – Aylesbury Vale Parkway


No Timetable Changes


A normal Monday-Friday timetable will operate with no planned alterations.