Changes To Train Times | Chiltern Railways

Changes To Train Times

January 2017

Sun Mon Tue Wed Thu Fri Sat
1
2
3
4
5
6
7
 
 
 
 
 
 
 
8
9
10
11
12
13
14
 
 
 
 
 
 
 
15
16
17
18
19
20
21
 
 
 
 
 
 
Minor change
Minor change

IMPORTANT: It has been necessary to make some minor changes to our New Year's Day timetables at short notice - Please ensure you refer to the "REVISED" pdf timetables attached below.


London – High Wycombe – Oxford / Birmingham


Timetable Changes – New Year’s Day


A special reduced-frequency Sunday timetable will operate throughout the day. Some journeys may be subject to partial bus replacement.


London – Amersham – Aylesbury Vale Parkway


Timetable Changes – New Year’s Day


A special reduced-frequency Sunday timetable will operate throughout the day. Some journeys may be subject to partial bus replacement.


 
Minor change
Minor change

London – High Wycombe – Oxford / Birmingham


Timetable Changes – Public Holiday


An amended Saturday timetable will operate; no services will call at Sudbury Harrow Road or Sudbury Hill Harrow.


London – Amersham – Aylesbury Vale Parkway


Timetable Changes – Public Holiday


An amended Saturday timetable will operate.


Please refer to the attached timetables for full details.


 
Minor change
Minor change

London – High Wycombe – Oxford / Birmingham


Timetable Changes – The FA Cup Third Round: Wycombe Wanderers vs Stourbridge FC (15:00 KO)


In connection with the above football event, Chiltern Railways are pleased to announce the operation of the following two additional public trains on this date, aimed at Stourbridge FC supporters making a day trip to High Wycombe:


* 09.53 Stourbridge Junction – High Wycombe: Calls at Cradley Heath (10.00) – Birmingham Moor Street (10.25) – High Wycombe (11.48).


* 18.14 High Wycombe – Stourbridge Junction: Calls at Birmingham Moor Street (19.32) – Cradley Heath (19.54) – Stourbridge Junction (20.07).


To facilitate further travel options to/from High Wycombe, the following trains are amended as shown:


* 09.12 Birmingham Snow Hill – Marylebone calls additionally at High Wycombe at 10.36.


* 10.12 Birmingham Snow Hill – Marylebone calls additionally at High Wycombe at 11.36.


* 11.12 Birmingham Snow Hill – Marylebone calls additionally at High Wycombe at 12.36.


* 12.12 Birmingham Snow Hill – Marylebone calls additionally at High Wycombe at 13.36.


* 17.10 Marylebone – Birmingham Snow Hill is extended to Cradley Heath (19.30) and Stourbridge Junction (19.42).


* 17.40 Marylebone – Birmingham Snow Hill calls additionally at High Wycombe at 18.03.


* 18.10 Marylebone – Birmingham Snow Hill is extended to Cradley Heath (20.30) and Stourbridge Junction (20.42).


* 18.40 Marylebone – Birmingham Snow Hill calls additionally at High Wycombe at 19.03.


* 19.40 Marylebone – Birmingham Snow Hill calls additionally at High Wycombe at 20.03.


Please refer to the attached timetable for full details.


 
Minor change
Minor change

London – High Wycombe – Oxford / Birmingham


Timetable Changes – Engineering Works


Due to engineering works taking place in the Aylesbury area, the line is closed between Princes Risborough and Aylesbury until 11:00. Rail replacement buses will operate between Princes Risborough and stations to Aylesbury during this period.


Trains will operate as normal between Marylebone and stations to Birmingham/Oxford.


London – Amersham – Aylesbury Vale Parkway


Timetable Changes – Engineering Works


Due to engineering works taking place in the Aylesbury area, the line is closed between Stoke Mandeville and Aylesbury until 11:00. Trains will operate between Marylebone and Great Missenden; rail replacement buses will operate between Great Missenden and stations to Aylesbury Vale Parkway.


Due to London Underground station staff strike action, Chiltern Railways trains are unable to call at London Underground stations (Harrow On The Hill to Amersham inclusive) after approximately 23:00.


Please refer to the attached timetables for full details.


 
Minor change
Minor change

London – High Wycombe – Oxford / Birmingham


Timetable Changes – Late Night Engineering Works


Due to engineering works, the line is closed between Leaminton Spa and Birmingham after 00.25. The following train will be affected:


* 23.07 Marylebone-Birmingham Moor Street will terminate at Leamington Spa (arr 00.25). A connecting rail replacement bus will operate from Leamington Spa to Warwick, Warwick Parkway, Solihull and Birmingham Moor Street, as follows:


Bus: Leamington Spa 00.30 – Warwick 00.40 – Warwick Parkway 00.50 – Solihull 01.15 – Birmingham Moor Street 01.40.


London – Amersham – Aylesbury Vale Parkway


Due to London Underground station staff strike action, Chiltern Railways trains are unable to call at London Underground stations (Amersham to Harrow On The Hill inclusive) before approximately 08.00.


Please refer to the attached timetable for full details.


 


 
Minor change
Minor change

London – High Wycombe – Oxford / Birmingham


Timetable Changes – Late Night Engineering Works


Due to engineering works, the line is closed between Leaminton Spa and Birmingham after 00.25. The following train will be affected:


* 23.07 Marylebone-Birmingham Moor Street will terminate at Leamington Spa (arr 00.25). A connecting rail replacement bus will operate from Leamington Spa to Warwick, Warwick Parkway, Solihull and Birmingham Moor Street, as follows:


Bus: Leamington Spa 00.30 – Warwick 00.40 – Warwick Parkway 00.50 – Solihull 01.15 – Birmingham Moor Street 01.40.


London – Amersham – Aylesbury Vale Parkway


No Timetable Changes


A normal Monday-Friday timetable will operate with no planned alterations.


 
Minor change
Minor change

London – High Wycombe – Oxford / Birmingham


Timetable Changes – Late Night Engineering Works


Due to engineering works, the line is closed between Leaminton Spa and Birmingham after 00.25. The following train will be affected:


* 23.07 Marylebone-Birmingham Moor Street will terminate at Leamington Spa (arr 00.25). A connecting rail replacement bus will operate from Leamington Spa to Warwick, Warwick Parkway, Solihull and Birmingham Moor Street, as follows:


Bus: Leamington Spa 00.30 – Warwick 00.40 – Warwick Parkway 00.50 – Solihull 01.15 – Birmingham Moor Street 01.40.


London – Amersham – Aylesbury Vale Parkway


No Timetable Changes


A normal Monday-Friday timetable will operate with no planned alterations.


 
Minor change
Minor change

London – High Wycombe – Oxford / Birmingham


Timetable Changes – Late Night Engineering Works


Due to engineering works, the line is closed between Leaminton Spa and Birmingham after 00.25. The following train will be affected:


* 23.07 Marylebone-Birmingham Moor Street will terminate at Leamington Spa (arr 00.25). A connecting rail replacement bus will operate from Leamington Spa to Warwick, Warwick Parkway, Solihull and Birmingham Moor Street, as follows:


Bus: Leamington Spa 00.30 – Warwick 00.40 – Warwick Parkway 00.50 – Solihull 01.15 – Birmingham Moor Street 01.40.


London – Amersham – Aylesbury Vale Parkway


No Timetable Changes


A normal Monday-Friday timetable will operate with no planned alterations.


 
Minor change
Minor change

London – High Wycombe – Oxford Parkway / Birmingham


Timetable Changes Late Night Engineering Works


Due to engineering works in the Banbury area, the 23.30 and 23.45 Marylebone – Banbury services will be replaced by buses between Bicester North and Banbury.


Please refer to the attached timetable for full details.


London – Amersham – Aylesbury Vale Parkway


No Timetable Changes


A normal Sunday timetable will operate with no planned alterations.


 
Minor change
Minor change

London – High Wycombe – Oxford / Birmingham


Timetable Changes – Minor Retimings


Throughout the day, many trains from Marylebone will depart up to 2 minutes earlier or later than normal.


London – Amersham – Aylesbury Vale Parkway


Timetable Changes – Additional Trains


In connection with London Underground engineering works, additional trains will operate between Marylebone and Harrow On The Hill (in both directions) throughout the day.


Trains will operate as normal between Marylebone and stations to Aylesbury Vale Parkway.


Please refer to the attached timetables for full details.