9th January 2017 | Chiltern Railways

9th January 2017

London – High Wycombe – Oxford / Birmingham

Timetable Changes – Late Night Engineering Works

Due to engineering works, the line is closed between Leaminton Spa and Birmingham after 00.25. The following train will be affected:

* 23.07 Marylebone-Birmingham Moor Street will terminate at Leamington Spa (arr 00.25). A connecting rail replacement bus will operate from Leamington Spa to Warwick, Warwick Parkway, Solihull and Birmingham Moor Street, as follows:

Bus: Leamington Spa 00.30 – Warwick 00.40 – Warwick Parkway 00.50 – Solihull 01.15 – Birmingham Moor Street 01.40.

London – Amersham – Aylesbury Vale Parkway

Due to London Underground station staff strike action, Chiltern Railways trains are unable to call at London Underground stations (Amersham to Harrow On The Hill inclusive) before approximately 08.00.

Please refer to the attached timetable for full details.

 

attachement

//www.chilternrailways.co.uk/sites/default/files/Monday-09-January-London-Amersham-Aylesbury.pdf