7th May 2017 | Chiltern Railways

7th May 2017

London – High Wycombe – Oxford / Birmingham

Timetable Changes – Engineering Works

Due to engineering works, the line is closed between Bicester Village and Oxford until 10:25. During this period, connecting rail replacement buses will operate between Bicester Village – Islip – Oxford Parkway – Oxford (in both directions).

Additionally, due to engineering works taking place in the Aylesbury area, buses replace trains between Aylesbury and Princes Risborough until 11:00.

London – Amersham – Aylesbury Vale Parkway

Timetable Changes – Engineering Works

Due to engineering works taking place in the Aylesbury area, the line is closed between Stoke Mandeville and Aylesbury until 11:00. Trains will operate between Marylebone and Great Missenden; rail replacement buses will operate between Great Missenden and stations to Aylesbury Vale Parkway. During this period, some southbound services will be replaced by a bus between Aylesbury Vale Parkway and Amersham, for a connecting London Underground service forward to Baker Street.

Please refer to the attached timetables for full details.

attachement

//www.chilternrailways.co.uk/sites/default/files/Sunday-07-May-London-HighWycombe-Oxford-Birmingham.pdf
//www.chilternrailways.co.uk/sites/default/files/Sunday-07-May-London-Amersham-Aylesbury.pdf