Skip to main content
Chiltern Railways - logo

28th January 2017

<p><strong>London – High Wycombe – Oxford / Birmingham</strong></p>
<p><span style="color:#0000ff;"><strong>Timetable Changes <strong><strong>–</strong></strong> Minor Retimings</strong></span></p>
<p>Throughout the day, many trains from Marylebone will depart up to 2 minutes earlier or later than normal.</p>
<p><strong>London – Amersham – Aylesbury Vale Parkway</strong></p>
<p><span style="color:#0000ff;"><strong>Timetable Changes <strong>–</strong> Additional Trains</strong></span></p>
<p>In connection with London Underground engineering works, additional trains will operate between Marylebone and Harrow On The Hill (in both directions) throughout the day.</p>
<p>Trains will operate as normal between Marylebone and stations to Aylesbury Vale Parkway.</p>
<p>Please refer to the attached timetables for full details.</p>

Last updated: 14/03/18 - 11:53