Skip to main content
Chiltern Railways - logo

28th April 2017

<p><strong>London – High Wycombe – Oxford / Birmingham</strong></p>
<p><span style="color:#ff0000;"><strong>Timetable Changes – Engineering Works</strong></span></p>
<p><strong>Early Morning:</strong> Due to overnight engineering works, the 05.02 Aylesbury – Marylebone service will start from High Wycombe at 05.31. A connecting rail replacement bus will operate from Aylesbury as follows:</p>
<p>Bus: Aylesbury 04.30 – Little Kimble 04.45 – Monks Risborough 04.50 – Princes Risborough 04.55 – Saunderton 05.00 – High Wycombe 05.20.</p>
<p><strong>London – Amersham – Aylesbury Vale Parkway</strong></p>
<p><span style="color:#008000;"><strong>No Timetable Changes</strong></span></p>
<p>A normal Monday-Friday timetable will operate with no planned alterations.</p>

Last updated: 14/03/18 - 11:53