26th April 2017 | Chiltern Railways

26th April 2017

London – High Wycombe – Oxford / Birmingham

Timetable Changes – Engineering Works

Early Morning: Due to overnight engineering works, the 05.02 Aylesbury – Marylebone service will start from High Wycombe at 05.31. A connecting rail replacement bus will operate from Aylesbury as follows:

Bus: Aylesbury 04.30 – Little Kimble 04.45 – Monks Risborough 04.50 – Princes Risborough 04.55 – Saunderton 05.00 – High Wycombe 05.20.

Late Night: Due to overnight engineering works, the line is closed between Princes Risborough and Aylesbury after 23.55. The following services will be amended as shown:

The 23.00, 23.30 and 00.10 Marylebone – Aylesbury will terminate at High Wycombe. Connecting rail replacement buses will operate between High Wycombe and stations to Aylesbury.

The 23.15 Oxford – High Wycombe will terminate at Princes Risborough. A connecting rail replacement bus will operate between Princes Risborough and High Wycombe.

London – Amersham – Aylesbury Vale Parkway

Timetable Changes – Engineering Works

Late Night: Due to overnight engineering works, the line is closed between Aylesbury and Aylesbury Vale Parkway after 21.35. The following services will be amended as shown:

The 20.57, 21.57, 22.57 and 23.57 Marylebone – Aylesbury Vale Parkway will terminate at Aylesbury. Connecting rail replacement buses will operate between Aylesbury and Aylesbury Vale Parkway.

Please refer to the attached timetables for full details.

attachement

//www.chilternrailways.co.uk/sites/default/files/Wednesday-26-April-London-HighWycombe-Oxford-Birmingham.pdf
//www.chilternrailways.co.uk/sites/default/files/Wednesday-26-April-London-Amersham-Aylesbury.pdf