Skip to main content
Chiltern Railways - logo

22nd January 2017

<p><strong>London – High Wycombe – Oxford / Birmingham</strong></p>
<p><span style="color:#ff0000;"><strong>Timetable Changes – Engineering Works</strong></span></p>
<p>Due to engineering works, the line is closed between Oxford Parkway and Oxford all day. Trains will operate as normal between Marylebone and Oxford Parkway (in both directions). Connecting Oxford Bus Company service 500 buses will operate between Oxford Parkway and Oxford.</p>
<p>Additionally, throughout the day, many trains from Marylebone will depart up to 2 minutes earlier or later than normal.</p>
<p><strong>London – Amersham – Aylesbury Vale Parkway</strong></p>
<p><span style="color:#0000ff;"><strong>Timetable Changes <strong>–</strong> Additional Trains</strong></span></p>
<p>In connection with London Underground engineering works, additional trains will operate between Marylebone and Harrow On The Hill (in both directions) throughout the day.</p>
<p>Trains will operate as normal between Marylebone and stations to Aylesbury Vale Parkway.</p>
<p>Please refer to the attached timetables for full details.</p>

Last updated: 14/03/18 - 11:53