21st May 2017 | Chiltern Railways

21st May 2017

London – High Wycombe – Oxford / Birmingham

Timetable Changes – Engineering Works & Wembley Stadium Event

Due to engineering works, the line is closed between Bicester Village and Oxford until 10:25. During this period, connecting rail replacement buses will operate between Bicester Village – Islip – Oxford Parkway – Oxford (in both directions).

Additionally, there is a sporting event at Wembley Stadium – Buildbase FA Vase & FA Trophy Double-Header. An amended timetable will operate for most of the day, with many services calling additionally at Wembley Stadium.

Please refer to the attached timetable for full details.

London – Amersham – Aylesbury Vale Parkway

No Timetable Changes

A normal Sunday timetable will operate, with no planned alterations.

attachement

//www.chilternrailways.co.uk/sites/default/files/Sunday-21-May-London-HighWycombe-Oxford-Birmingham.pdf