17th April 2017 | Chiltern Railways

17th April 2017

London – High Wycombe – Oxford / Birmingham

Timetable Changes – Easter Monday (Public Holiday)

An amended Saturday timetable will operate; no services will call at Sudbury Harrow Road or Sudbury Hill Harrow.

London – Amersham – Aylesbury Vale Parkway

Timetable Changes – Engineering Works

All Day: Due to London Underground engineering works, a reduced service of one train per hour will operate between Aylesbury Vale Parkway and stations to Amersham. Connecting buses will operate between Amersham and Beaconsfield, for connecting trains to/from Marylebone.

Please refer to the attached timetables for full details.

attachement

//www.chilternrailways.co.uk/sites/default/files/Monday-17-April-London-HighWycombe-Oxford-Birmingham_0.pdf
//www.chilternrailways.co.uk/sites/default/files/Monday-17-April-London-Amersham-Aylesbury_0.pdf